A specialty chemical manufacturer was evaluating options to reduce fresh-water demand and improve the consistency of its wastewater reuse process.
Fluid Sep reviewed the available stream information and evaluated a staged membrane approach against the site’s operating constraints. The assessment considered feed variability, pretreatment needs and permeate quality targets.
The study gave the project team a clearer basis for planning a pilot and identifying the additional sampling needed before detailed engineering.